How it works

From your first call to 25 years of free power.

Seven clear steps, one team, and no paperwork for you to chase.

Step by step

What happens, and when.

  1. Week 1

    Free site survey

    An engineer visits, checks your roof, shade, wiring and the last few bills, and answers every question.

  2. Week 1

    Design & quotation

    A roof layout with expected generation, savings, subsidy and a clear, all-inclusive price.

  3. Week 1–2

    Subsidy registration

    We register you on the PM Surya Ghar portal and apply for net metering with your electricity company.

  4. 1–2 days

    Installation

    Structure, panels, inverter, earthing and wiring, installed and tested by our own team.

  5. Week 3–5

    Inspection & net meter

    The electricity company inspects the plant and fits the net meter. We coordinate every visit.

  6. After commissioning

    Switch-on & subsidy

    Your plant starts saving. We upload the commissioning report and follow the subsidy until it reaches your bank.

  7. For life

    25 years of care

    Service visits, warranty claims and monitoring through one number and the RAVC customer portal.

Net metering

Your meter runs both ways.

In the afternoon your roof usually makes more than you use. The net meter sends that surplus to the grid and records it. At the end of the month you pay only for the difference.

Technician installing a digital net meter on a house wall
RAVC engineer on site
On site

Installed by our own engineers.

No sub-contracted strangers on your roof. Trained RAVC teams follow the same checklist on every job.

Questions

Before you start

Does solar work in the monsoon?

Yes. Panels make power from daylight, so cloudy days drop to roughly 20–40% of normal output, not zero. The sunny months more than make up for it across the year.

How much roof space do I need?

About 10–12 square metres (100–120 sq ft) of shadow-free roof for every kW. A 3 kW home system needs roughly 30–36 m², and an elevated structure keeps your terrace usable underneath.

How long does installation take?

The installation itself usually takes one to two days for a home. From survey to switching on, including design and the net-metering approval, most homes are running within three to six weeks.

What is net metering?

A net meter records the power you send to the grid as well as what you take. At the end of the billing cycle you pay only for the difference, so the extra units your roof makes in the afternoon reduce your bill.

Will solar work during a power cut?

A standard on-grid system switches off during a power cut for safety. If you want backup, ask for a hybrid system with batteries.

Book your free site survey.

It takes about an hour and there is no obligation.